archive

email from NOLA


View current page
...more recent posts

Rocheblave Ribbon
In the end the final mechanical inspection for the Rocheblave house, the one I had been for so long dreading, amounted to ninety seconds of small talk, a glance around, and a handshake. The inspector remembered me from--well, you know, it took me years (4.2) to finish this job--way back and had wondered if I'd ever finish. He even went way beyond the call of duty and without telling me set in motion all the steps which resulted in the last official detail, the release of the permanent electric meter. I had to make some calls to verify this, a thing (phone calling) which overcoming fear of impresses me well beyond the proportionate difficulty of the task.

The permanent meter does not really perform any differently than the temporary meter but I would not be able to leave here and rent the place out with a temporary meter. And the temporary meter, attached to a four by four pounded into the ground in front of the house was so Beverly Hillbilly, on a property in a neighborhood surrounded by attempts at improvement, even if all attempts at improvement are seemingly overwhelmed by the general ghetto nature of New Orleans.

I have been given the Rocheblave ribbon of completion, which I wear proudly on a uniform not at all replete with ribbons of completion. M on Dumaine is taking care of some business for me that requires multiple phone calling and this I divulge as a preemptive admission against partisan politicians who may try to keep me from my bid as rightful landlord of the white house, on the premise that I did not earn my ribbon of completion. I ain't maybe all that I could be but I feel most earnestly that I earned my ribbon. Requiring assistance is not a weakness. There, I said it.

I have a few odds and ends to take care off, a piece of wood to put here or there, and a little painting to do inside and out (It is raining all day everyday this week so I'm wishing me luck.) Got to get some carpet in the bedroom (can't pick it up because of rain); make one last haul to the dump; get the AC checked; do a change of address; pay some bills; load up the truck; take some pictures; go to the park; can't afford crawfish this year; have some keys copied; of course procrastinate to the very end; say a goodbye or two; go up on the roof and check it out; watch my last two Netflix DVDs, part 1 of 50 Years War: Israel and the Arabs, and Fog of War; drive away.
- jimlouis 5-14-2004 8:03 pm [link] [14 comments]