The Port Authority of New York and New Jersey does not know what to do with Eero Saarinen’s TWA Terminal at JFK International Airport. At the end of November, the organization will issue a Request for Proposals (RFP) to see what developers may have in mind for the landmark. “It is really wide open,” said Authority spokesman Pasquale DiFulco. “We are leaving it to the imaginations of the developers who respond to the RFP. It could be a destination resort, a spa, an aviation museum. There are 10,000 square feet that could be offices—the possibilities are endless.” DiFulco noted that developers will be asked to assemble a team of experts that can assure that the building will be refurbished and operated in a sustainable manner, but was hesitant to spell out specific details.

Currently, the dynamic structure sits dark as the construction of JetBlue Airway’s Terminal 5, designed by Gensler, with some interiors by the Rockwell Group, progresses behind it. Although the building’s future use is still unclear, the RFP at least eliminates one previous fate. JetBlue had proposed using the Saarinen building as a gateway to its new terminal. While the airline will install a couple of check-in kiosks in the old terminal’s main hall, the building won’t be a part of its operations; Beyer Blinder Belle surveyed and documented the terminal for the Port Authority, but is not heading the restoration.
- bill 12-16-2006 11:28 pm




add a comment to this page:

Your post will be captioned "posted by anonymous,"
or you may enter a guest username below:


Line breaks work. HTML tags will be stripped.