For now this page deals only with the section of the building that my family and I will be living in. The goal is to open up all the common rooms/spaces to create an open plan. The total space is around 2200 sq. ft. but feels like a maze of small rooms. This is the west room which will serve as the kitchen-dining-living room. At this stage it was 480 sq. ft. I've demolished the wall that separates the bathroom, it's now 680 sq ft.
Blue room pre-demo 360º view
breaking through to bathroom
On day 2 I swapped the mask with organic vapor filters for a 3M silicone mask and 0% particulate filters. Throat's much happier now. Still using the Lovey Howell issue bamboo hard hat
removing bathroom lockers
bathroom wall gone
pulling the showers out was a chore. Behind them was a big window which the firemen covered over. I'll replace it.
East wall pre-demo. This wall is load bearing so I won't remove the studs and posts until I get a beam up into the attic
view from other side
demo of this room is almost complete. I've left one of the toilet stall walls up for now. As well as some studs, turns out that wall to the bathroom was load bearing. I'll be doing some more reinforcing in the attic.
I'll include a 360º view when finished with demo in this room.
Demo is almost complete throughout the unit and at this point I'm framing walls with my father in law. He's an expert builder and I'm lucky to have his help and enthusiasm. I'm learning a lot as he's quick to let me know when I screw up.
|
This is the west room which will serve as the kitchen-dining-living room. At this stage it was 480 sq. ft. I've demolished the wall that separates the bathroom, it's now 680 sq ft.
Blue room pre-demo 360º view
breaking through to bathroom
On day 2 I swapped the mask with organic vapor filters for a 3M silicone mask and 0% particulate filters. Throat's much happier now. Still using the Lovey Howell issue bamboo hard hat
removing bathroom lockers
bathroom wall gone
pulling the showers out was a chore. Behind them was a big window which the firemen covered over. I'll replace it.
East wall pre-demo. This wall is load bearing so I won't remove the studs and posts until I get a beam up into the attic
view from other side
demo of this room is almost complete. I've left one of the toilet stall walls up for now. As well as some studs, turns out that wall to the bathroom was load bearing. I'll be doing some more reinforcing in the attic.
- steve 4-13-2007 6:59 pm
I'll include a 360º view when finished with demo in this room.
Demo is almost complete throughout the unit and at this point I'm framing walls with my father in law. He's an expert builder and I'm lucky to have his help and enthusiasm. I'm learning a lot as he's quick to let me know when I screw up.
- steve 4-13-2007 8:07 pm